Basic Guidelines for Optimization of Time and Quality Execution of Detailed Piping Design

Victor A.P. Chevitarese, Marcos Tadeu Tavares Pacheco, Aldo Ramos Santos, Deovaldo Moraes Jr., Marlene S. Moraes


The increasing and periodic increase of the country's energy consumption requires in the short term large investments in new industrial units, mainly in the oil and gas sector. Excellence in the execution of projects, specifically in terms of time and quality, are decisive factors for the successful implementation of an enterprise. The chronology and methodology of execution of the detailed project activities appropriate to the venture bring significant benefits to the construction and assembly, with a strong impact in reducing costs. This article analyzes the negative results obtained in the implantation of an oil processing unit, highlighting the design stage and shows some engineering practices useful for the elaboration of detailed piping projects.

Keywords: Detailed Design, Piping Design, Electronic Mockup, Process Units, Production Unit

Full Text: PDF


  • There are currently no refbacks.