The temporal mismatch of the Brazilian Low-Carbon Hydrogen Development Programme and marine e-methanol: what Decree 13,096/2026 dated, narrowed and allocated
Main Article Content
Abstract
E-methanol projects for marine bunkering reach final investment decision before the Brazilian tax credit becomes available. The question is what the implementing decree did with that interval. Doctrinal-normative analysis of primary sources, with validity checked on 16 September 2026. Decree 13,096/2026 dated the credits between 2030 and 2034, restricted the tax suspension to acquisitions made until 31 December 2026 — apparently narrower than the statutory term — and prioritised industrial self-consumption, in tension with the statute’s export objectives. Viability cannot rest on the incentive within the investment-decision horizon; a contractual crossing structure is proposed.
Downloads
Article Details
Section

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.